SHANYUAN manufactures insulated laminated busbars in three engineered families — battery busbars, power electronics busbars and busbar components & accessories — plus fully custom designs built to your drawing.
적층 버스바는 다층 도체 조립체입니다: 얇은 유전체 필름으로 분리된 평평한 구리 도체를 열과 압력으로 하나의 절연 부품에 결합한 것입니다. 터미널은 사전 장착되며 전체 조립체는 설치 준비 완료 상태로 납품됩니다.

Compared with hand-routed cable harnesses, laminated busbars deliver lower stray inductance, higher power density and faster, error-proof assembly.

Multi-terminal insulated laminates for EV battery modules, ESS racks and BMS interconnections.
Browse battery busbars
Blade- and tab-terminal laminates for IGBT modules, inverters, DC links and capacitor banks.
Browse power busbars
Flexible and solid-insulated bars, grounding kits, connectors, insulators and insulation building blocks.
Browse components
Any layer count, terminal layout and mounting configuration — from drawing to delivered parts.
Start a custom project레이어 수, 터미널 및 치수는 도면을 따릅니다 – 아래 모델이 패밀리와 참조 사양을 정의합니다.


































PVC 자켓에 적층 주석 도금 동 라미네이트를 담은 대전류 플렉서블 버스바, 정격 250-2000 A, UL 94 V-0, 드릴-볼트 단부, 100% 히포트 시험




The same laminated construction — copper conductors, dielectric films, tooled terminals — goes into five more power markets. Pick the one you are designing for.
Traction converters and auxiliary power units: welded, vibration-proof laminates derated for continuous, unattended service.
Converter DC links for renewable inverters moving toward 1500 VDC, with isolation and partial-discharge control built in.
Low-profile distribution buswork inside rectifier cabinets and server power bays, shaped for airflow and fast service.
DC fast charger power cabinets: high-voltage DC links with low-loss distribution from rectifier to outlet connector.
VFD and motor drive DC links that switch faster, run cooler and fit into shrinking enclosure volumes.
| Capability | Range |
|---|---|
| Conductor layers | 1–6+ (custom stack-ups) |
| Conductor material | C11000 copper (standard), aluminum on request |
| Plating | Tin (standard) |
| Dielectrics | PET, Nomex, epoxy (DLF) |
| Terminal types | M6/M8 threaded studs, blade tabs, screw terminals, welded tabs, fused links |
| Current rating | Per design, up to ~1000 A |
| Mounting | Integrated brackets, standoffs, edge seals |
사양 검토에서 출하·검증된 부품까지 – 한 곳에서 책임지는 공급업체.
로트별 하이팟, 절연, 치수, 육안 및 통전 검사 – 요청 시 선적과 함께 제공되는 치수 및 전기 시험 기록 포함.
Engineering, tooling and production under one roof in Shandong, China — 1–6+ layers, up to ~1000 A, one business day technical response.
엔지니어링 팀의 명확한 답변.
Send the current profile, voltage class and terminal types — we will point you to the right configuration, or quote a fully custom part.