SHANYUAN manufactures insulated laminated busbars in three engineered families — battery busbars, power electronics busbars and busbar components & accessories — plus fully custom designs built to your drawing.
積層バスバーは多層導体アセンブリです:薄い誘電体フィルムで隔てられた平銅導体を、熱と圧力で1つの絶縁部品に結合したもの。端子はプレ実装され、アセンブリ全体が設置準備完了で納品されます。

Compared with hand-routed cable harnesses, laminated busbars deliver lower stray inductance, higher power density and faster, error-proof assembly.

Multi-terminal insulated laminates for EV battery modules, ESS racks and BMS interconnections.
Browse battery busbars
Blade- and tab-terminal laminates for IGBT modules, inverters, DC links and capacitor banks.
Browse power busbars
Flexible and solid-insulated bars, grounding kits, connectors, insulators and insulation building blocks.
Browse components
Any layer count, terminal layout and mounting configuration — from drawing to delivered parts.
Start a custom project層数、端子、寸法は図面に従います – 以下のモデルがファミリーと参照仕様を定義します。


































すずめっき銅積層体をPVCジャケットに収めた大電流フレキシブルバスバー。250-2000 A定格、UL 94 V-0、穴ボルト端、全数hi-pot試験済――電流容量データ請求。




The same laminated construction — copper conductors, dielectric films, tooled terminals — goes into five more power markets. Pick the one you are designing for.
Traction converters and auxiliary power units: welded, vibration-proof laminates derated for continuous, unattended service.
Converter DC links for renewable inverters moving toward 1500 VDC, with isolation and partial-discharge control built in.
Low-profile distribution buswork inside rectifier cabinets and server power bays, shaped for airflow and fast service.
DC fast charger power cabinets: high-voltage DC links with low-loss distribution from rectifier to outlet connector.
VFD and motor drive DC links that switch faster, run cooler and fit into shrinking enclosure volumes.
| Capability | Range |
|---|---|
| Conductor layers | 1–6+ (custom stack-ups) |
| Conductor material | C11000 copper (standard), aluminum on request |
| Plating | Tin (standard) |
| Dielectrics | PET, Nomex, epoxy (DLF) |
| Terminal types | M6/M8 threaded studs, blade tabs, screw terminals, welded tabs, fused links |
| Current rating | Per design, up to ~1000 A |
| Mounting | Integrated brackets, standoffs, edge seals |
仕様レビューから出荷・試験済み部品まで – 一貫して責任を持つ供給元。
ロットごとのハイポット、絶縁、寸法、外観、導通検査 – 要求に応じて出荷に添付される寸法・電気試験記録付き。
Engineering, tooling and production under one roof in Shandong, China — 1–6+ layers, up to ~1000 A, one business day technical response.
エンジニアリングチームによる明確な回答。
Send the current profile, voltage class and terminal types — we will point you to the right configuration, or quote a fully custom part.