SHANYUAN manufactures insulated laminated busbars in two engineered families — battery busbars and power electronics busbars — plus fully custom designs built to your drawing.
What Is a Laminated Busbar?
A laminated busbar is a multi-layer conductor assembly: flat copper conductors separated by thin dielectric films, bonded under heat and pressure into a single insulated part. Terminals are pre-mounted and the whole assembly arrives ready to install. Compared with hand-routed cable harnesses, laminated busbars deliver lower stray inductance, higher power density and faster, error-proof assembly.

Multi-terminal insulated laminates for EV battery modules, ESS racks and BMS interconnections.
Browse battery busbars

Blade- and tab-terminal laminates for IGBT modules, inverters, DC links and capacitor banks.
Browse power busbars

Any layer count, terminal layout and mounting configuration — from drawing to delivered parts.
Start a custom project
All Busbar Products
-

BMS busbar combining power and voltage-sense layers with copper terminal studs.
-

Compact laminated busbar assembly with blade terminals for low-profile power distribution.
-

Multi-tab laminated busbar for capacitor bank connections in power converters.
-

Compact laminated cell fusion busbar with threaded stud for battery management and fused connections.
-

Matched pair of copper link busbars with mounting tabs for series and parallel battery connections.
-

Two-layer insulated laminate with screw terminals for cell-to-cell interconnection in compact battery packs.
-

Laminated busbar for EV traction inverters with blade terminals for high-voltage architectures.
-

High-current laminated busbar for EV battery modules with distributed stud terminals and sealed edges.
-

Laminated busbar set for IGBT power modules with matched tab terminals for phase legs.
-

Long laminated DC link busbar with blade terminals for low-inductance inverter designs.
-

Multi-layer insulated laminated busbar with mixed terminal types for complex distribution layouts.
-

Insulated laminated busbar with eight double-threaded terminals for high-current distribution across EV battery modules.