Compact laminated busbar assembly with blade terminals for low-profile power distribution.

Product imagery: factory photo plus studio renders. The exact geometry, layers and terminals of your part follow your drawing.
Final values follow your drawing — this is the standard configuration of the family.
| Parameter | Value |
|---|---|
| ParameterValue | ConductorC11000 copper, tin plated |
| Conductor layers1–2 (typical) | DielectricPET / Nomex / epoxy (DLF), selected by voltage class |
| TerminalsBlade terminals (one side) | Current ratingPer design, up to ~1000 A |
| Edge treatmentFull edge sealing | SKUSY-PE-206 |
Key characteristics of this product family.

Compact laminated busbar assembly with blade terminals for low-profile power distribution.
A compact blade-terminal laminate for low-profile power distribution inside enclosures where vertical space is limited. The blade terminals mate directly with connector housings or module pins, removing the need for separate lug hardware.
Where this busbar configuration earns its place.
Where this busbar configuration earns its place.
Where this busbar configuration earns its place.
Where this busbar configuration earns its place.
Your drawings reach the engineers who build the part.
Design risks flagged when changes are cheap.
Test records per lot, CoC and PPAP on request.
Drawing to delivered production parts, one supplier.
From spec review to shipped, tested parts — one accountable supplier.
Straight answers from the engineering team.
Layers, terminals, dielectrics and mounting are all configurable. Send us your spec for DFM review and a quotation within one business day.
Send drawings, current ratings and voltage class — DFM feedback and a quotation within one business day.