Mon–Fri 9:00–18:00 · CST (UTC+8) · Shandong, China
SHANYUAN Editorial Team

Authors & Contributors

Meet the SHANYUAN engineering authors: the electrical, materials, testing, manufacturing and procurement specialists behind every busbar guide and industry analysis.

Aiko Tanaka

Aiko Tanaka

Application Engineering Manager

Aiko Tanaka is application engineering manager at SHANYUAN, with 11 years in applying laminated busbars to dat…

Data CenterEnergy StorageApplication Engineering
Daniel Richter

Daniel Richter

Chief Electrical Engineer

Daniel Richter is the chief electrical engineer at SHANYUAN Laminated Busbars, with 15 years in laminated busb…

Busbar DesignDC-LinkThermal Simulation
David Osei

David Osei

Product Marketing Engineer

David Osei is a product marketing engineer covering SHANYUAN's laminated busbar product lines. With 9 yea…

Product MarketingApplication SelectionTechnical Content
Elena Vasquez

Elena Vasquez

Power Electronics Application Engineer

Elena Vasquez is a power electronics application engineer with 10 years of experience integrating laminated bu…

EV InverterEMCPCS Integration
Emily Novak

Emily Novak

Energy Industry Analyst & Technical Writer

Emily Novak analyses energy-storage, grid and new-energy markets and turns them into procurement-ready technic…

Energy StorageMarket ResearchTechnical Writing
Lucas Meyer

Lucas Meyer

Procurement & Supply-Chain Advisor

Lucas Meyer advises procurement and supply-chain teams on copper sourcing, busbar pricing and supplier evaluat…

Copper SourcingProcurement StrategyCost Modeling
Nadia Rahman

Nadia Rahman

Quality & Compliance Engineer

Nadia Rahman is a quality and compliance engineer with 9 years in electrical-component quality systems. She ma…

ISO 9001UL ComplianceQuality Control
Sofia Lindqvist

Sofia Lindqvist

HV Test & Partial Discharge Engineer

Sofia Lindqvist is a high-voltage test and partial discharge engineer with 8 years in dielectric qualification…

Partial DischargeIEC 60270HV Testing
Thomas O'Brien

Thomas O'Brien

Manufacturing Process Engineer

Thomas O'Brien is a manufacturing process engineer with 14 years in stamping, lamination and terminal mac…

StampingLaminationCNC Machining
Wei Chen

Wei Chen

Dielectric & Insulation Specialist

Wei Chen is a dielectric and insulation specialist at SHANYUAN, with 12 years in insulation systems for lamina…

Insulation SystemCreepageMaterial Science

Talk to the engineering team directly?

Every article is grounded in our production process and test data. Send your busbar question and the relevant author will reply.