Laminated busbar for power converters with side tab terminals and central mounting stud.

Product imagery: factory photo plus studio renders. The exact geometry, layers and terminals of your part follow your drawing.
Final values follow your drawing — this is the standard configuration of the family.
| Parameter | Value |
|---|---|
| ParameterValue | ConductorC11000 copper, tin plated |
| Conductor layers2 (typical) | DielectricPET / Nomex / epoxy (DLF), selected by voltage class |
| TerminalsSide blade tabs + central threaded stud | Current ratingPer design, up to ~1000 A |
| Edge treatmentFull edge sealing | SKUSY-PE-205 |
Key characteristics of this product family.

Laminated busbar for power converters with side tab terminals and central mounting stud.
This power electronics busbar carries the phase output of a converter or inverter stage. Side tab terminals mate to the output buswork while the central stud provides the mechanical anchor — a common layout for industrial drives and power supplies.
Where this busbar configuration earns its place.
Where this busbar configuration earns its place.
Where this busbar configuration earns its place.
Where this busbar configuration earns its place.
Your drawings reach the engineers who build the part.
Design risks flagged when changes are cheap.
Test records per lot, CoC and PPAP on request.
Drawing to delivered production parts, one supplier.
From spec review to shipped, tested parts — one accountable supplier.
Straight answers from the engineering team.
Layers, terminals, dielectrics and mounting are all configurable. Send us your spec for DFM review and a quotation within one business day.
Send drawings, current ratings and voltage class — DFM feedback and a quotation within one business day.