Mon–Fri 9:00–18:00 · CST (UTC+8) · Shandong, China
Product

Copper Battery Link Busbar Pair

Matched pair of copper link busbars with mounting tabs for series and parallel battery connections.

Copper Battery Link Busbar Pair laminated busbar

Product imagery: factory photo plus studio renders. The exact geometry, layers and terminals of your part follow your drawing.

Specifications

Reference specification

Final values follow your drawing — this is the standard configuration of the family.

ParameterValue
ParameterValueConductorC11000 copper, tin plated
Conductor layers1–2 (typical)DielectricPET / Nomex / epoxy (DLF), selected by voltage class
Terminals2 × screw terminals per link + mounting tabsCurrent ratingPer design, up to ~1000 A
Edge treatmentFull edge sealingSKUSY-BB-104
Why This Family

Engineered for battery modules and ESS

Key characteristics of this product family.

  • Low stray inductance for fast switching circuits
  • Full edge sealing for high-voltage creepage requirements
  • Tin-plated C11000 conductors for corrosion resistance
  • Dielectric selected by voltage class and temperature
  • Tooled, repeatable geometry — no assembly variation
  • Factory-direct with DFM review before tooling
Terminal welding detail on a SHANYUAN Copper Battery Link Busbar Pair laminated busbar
Product Overview

About this busbar family

Matched pair of copper link busbars with mounting tabs for series and parallel battery connections.

A matched pair of copper link busbars for symmetric pack layouts — one for each side of a module or string. Both parts are cut from the same tooling, so terminal positions and mounting tabs line up across the assembly without shimming or rework.

Typical Applications

Where you will find this family

Series / parallel battery linksSymmetric module layoutsServiceable pack joints

Where this busbar configuration earns its place.

Design Notes

Where this busbar configuration earns its place.

Supplied as a matched pair with identical tooling. Mounting tab geometry follows your enclosure design.

Where this busbar configuration earns its place.

All specifications are typical and fully customizable to your drawing. Request a quote for this busbar or send your own specification — our engineers respond within one business day.

Where this busbar configuration earns its place.

Why Buy Direct from SHANYUAN

Manufacturer, not trading company

01

Direct engineering

Your drawings reach the engineers who build the part.

02

DFM before tooling

Design risks flagged when changes are cheap.

03

Documented QC

Test records per lot, CoC and PPAP on request.

04

End to end

Drawing to delivered production parts, one supplier.

Project Flow

How a custom project runs

From spec review to shipped, tested parts — one accountable supplier.

Spec ReviewDrawing, current rating, layers and terminals confirmed with you
DFM ReviewEdge distances, weld zones and clearances checked before tooling
QuotationTechnical and commercial quote within one business day
Sample BuildPrototypes for fit and electrical verification
Tooled ProductionControlled process with documented QC per lot
DeliveryPacked to your requirements, test records on request
FAQ

Frequently asked questions

Straight answers from the engineering team.

Can you provide documentation for our quality system?
Dimensional and electrical test records are maintained per lot. If your quality system requires CoCs, specific formats or PPAP-style documentation, tell us at quotation stage and we align the paperwork with your requirements.
What current ratings can SHANYUAN busbars handle?
Rating is designed per application up to roughly 1000 A, sized against continuous and peak current with thermal margin — see our ampacity chart for the starting reference points.
Do you support low-volume prototypes before production?
Yes. Custom projects typically run: spec review, DFM, quotation, sample build for fit and electrical verification, then tooled production with documented QC per lot.
How long does a sample build take?
A sample is typically produced within 5–7 working days from drawing approval. Fit and electrical verification is done in-house, and you receive test results together with the sample.
What quality system do you follow?
Production follows a documented process chain with batch records: incoming material checks, dimensional inspection, hipot and insulation testing, continuity checks and final visual inspection. Test records are issued per lot on request.
Do you offer warranty on your busbars?
Yes. Parts are covered against material and workmanship defects for the agreed warranty period stated in the purchase agreement. Any non-conforming parts are reworked or replaced, with failure analysis shared on request.
Related Models

From the same family

Battery Management System Busbar busbar
SY-BB-110

Battery Management System Busbar

View
Multi-Layer Insulated Busbar busbar
SY-BB-108

Multi-Layer Insulated Busbar

View
Compact Cell Fusion Busbar busbar
SY-BB-107

Compact Cell Fusion Busbar

View

Customize this busbar to your drawing

Layers, terminals, dielectrics and mounting are all configurable. Send us your spec for DFM review and a quotation within one business day.

Talk to our engineering team

Send drawings, current ratings and voltage class — DFM feedback and a quotation within one business day.

Send an InquiryWhatsApp