Insulated laminated busbar with eight double-threaded terminals for high-current distribution across EV battery modules.

Product imagery: factory photo plus studio renders. The exact geometry, layers and terminals of your part follow your drawing.
Final values follow your drawing — this is the standard configuration of the family.
| Parameter | Value |
|---|---|
| ParameterValue | ConductorC11000 copper, tin plated |
| Conductor layers2 (typical) | DielectricPET / Nomex / epoxy (DLF), selected by voltage class |
| Terminals8 × double M6 threaded studs (position per drawing) | Current ratingPer design, up to ~1000 A |
| Edge treatmentFull edge sealing | SKUSY-BB-101 |
Key characteristics of this product family.

Insulated laminated busbar with eight double-threaded terminals for high-current distribution across EV battery modules.
A multi-terminal battery module busbar distributes high current across the parallel cell groups of an EV battery module. This laminate carries eight double-terminal positions on a single insulated plate, replacing the bundle of cables or flat straps typically used for module-level interconnection.
Where this busbar configuration earns its place.
Where this busbar configuration earns its place.
Where this busbar configuration earns its place.
Where this busbar configuration earns its place.
Your drawings reach the engineers who build the part.
Design risks flagged when changes are cheap.
Test records per lot, CoC and PPAP on request.
Drawing to delivered production parts, one supplier.
From spec review to shipped, tested parts — one accountable supplier.
Straight answers from the engineering team.
Layers, terminals, dielectrics and mounting are all configurable. Send us your spec for DFM review and a quotation within one business day.
Send drawings, current ratings and voltage class — DFM feedback and a quotation within one business day.