Electrostatic epoxy powder coating service for busbars and connectors — insulation on any shape.

Product imagery: factory photo plus studio renders. The exact geometry, layers and terminals of your part follow your drawing.
Final values follow your drawing — this is the standard configuration of the family.
| Parameter | Value |
|---|---|
| Process | Electrostatic powder, thermally cured |
| Dielectric strength | 800 V/mil (typical) |
| Continuous rating | 130 °C (typical class) |
| Flammability | UL 94 V-0 grade material |
| Masking | Terminal ends masked per drawing |
| Colors | Red, black, grey, custom |
| SKU | SY-CM-312 |
Key characteristics of this product family.

Electrostatic epoxy powder coating applies a continuous dielectric skin over formed busbars and connectors — the right answer for irregular shapes that films cannot wrap. The cured layer is flame- and moisture-resistant and delivers the insulation where clearance distances are tight, with bare or plated ends masked for bolted connections.
Where this busbar configuration earns its place.
Where this busbar configuration earns its place.
Where this busbar configuration earns its place.
Where this busbar configuration earns its place.
Where this busbar configuration earns its place.
Where this busbar configuration earns its place.
Your drawings reach the engineers who build the part.
Design risks flagged when changes are cheap.
Test records per lot, CoC and PPAP on request.
Drawing to delivered production parts, one supplier.
From spec review to shipped, tested parts — one accountable supplier.
Straight answers from the engineering team.
Every SHANYUAN busbar is custom, but the power circuits they connect recur across markets. Three typical ones — send us yours and we will point to the right stack-up.
Tight, low-inductance links between the battery source and traction inverters, fully edge-sealed for 400–800 V platforms.
ExploreCommutation-loop connections from DC-link capacitors to IGBT bridges, designed against switching overshoot V = L × di/dt.
ExploreConverter DC links built for rising bus voltages toward 1500 VDC, with creepage and partial-discharge margins included.
ExploreLayers, terminals, dielectrics and mounting are all configurable. Send us your spec for DFM review and a quotation within one business day.
Send drawings, current ratings and voltage class — DFM feedback and a quotation within one business day.