These terms govern the use of the SHANYUAN website and the information published on it.
Website Content
All content on this website — text, images, drawings, technical tables and product descriptions — is published by Rizhao Shanyuan Electronic Components Co., Ltd. for general information about our laminated busbar products and capabilities. Specifications described as “typical” or “customizable” are indicative ranges; final specifications are defined in the quotation and drawings agreed for each project.
Quotations and Orders
Submitting an inquiry through this website does not constitute a contract. Quotations are issued separately and are valid for the period stated in each quotation. Production begins only after written order confirmation and, where applicable, sample approval.
Technical Information
Ampacity values, material guidance and engineering notes published on this site are general reference information for design discussion. They do not replace project-specific engineering review. Final component selection remains the responsibility of the customer’s design authority.
Intellectual Property
The SHANYUAN name, logo and website content are protected by applicable intellectual property laws. Customer drawings and specifications shared with us remain the customer’s property and are used only to prepare quotations and produce agreed parts.
Limitation of Liability
This website is provided on an “as is” basis. While we work to keep the information accurate and current, we do not warrant that all content is complete or error-free at all times. Liability in connection with products supplied is governed by the terms of the applicable order confirmation.
Governing Terms
These terms are governed by the laws of the People’s Republic of China. For any questions regarding these terms, contact us through the channels on our contact page.
