Compact laminated cell fusion busbar with threaded stud for battery management and fused connections.

Product imagery: factory photo plus studio renders. The exact geometry, layers and terminals of your part follow your drawing.
Final values follow your drawing — this is the standard configuration of the family.
| Parameter | Value |
|---|---|
| ParameterValue | ConductorC11000 copper, tin plated |
| Conductor layers1–2 (typical) | DielectricPET / Nomex / epoxy (DLF), selected by voltage class |
| Terminals2 × screw tabs + 1 × threaded stud | Current ratingPer design, up to ~1000 A |
| Edge treatmentFull edge sealing | SKUSY-BB-107 |
Key characteristics of this product family.

Compact laminated cell fusion busbar with threaded stud for battery management and fused connections.
This compact laminate combines the power path and a fused link in one thin assembly for cell-level protection. The threaded stud provides the measurement or service tap, while the fused section isolates the cell group on a fault — a layout common in BMS-protected packs.
Where this busbar configuration earns its place.
Where this busbar configuration earns its place.
Where this busbar configuration earns its place.
Where this busbar configuration earns its place.
Your drawings reach the engineers who build the part.
Design risks flagged when changes are cheap.
Test records per lot, CoC and PPAP on request.
Drawing to delivered production parts, one supplier.
From spec review to shipped, tested parts — one accountable supplier.
Straight answers from the engineering team.
Layers, terminals, dielectrics and mounting are all configurable. Send us your spec for DFM review and a quotation within one business day.
Send drawings, current ratings and voltage class — DFM feedback and a quotation within one business day.