A practical guide to laminated busbar design — how they are built, how to choose dielectrics, how current capacity works, and what to check before you release a drawing.
| Material | Strengths | Watch-outs |
|---|---|---|
| PET (Mylar) | Low cost, good dielectric strength, thin for compact stacks | Lower continuous temperature limit than alternatives |
| Nomex | High temperature rating, excellent thermal stability | Higher cost, thicker per layer |
| Epoxy (DLF) | Rigid, self-extinguishing options, good mechanical strength | Less flexible stack-up, material handling during layup |
| Copper cross-section | Approx. DC current (30 °C rise) |
|---|---|
| 10 × 3 mm | ~150 A |
| 20 × 3 mm | ~250 A |
| 30 × 5 mm | ~450 A |
| 40 × 5 mm | ~550 A |
| 50 × 5 mm | ~650 A |
| 60 × 6 mm | ~800 A |
| 80 × 6 mm | ~1000 A |
| 100 × 6 mm | ~1150 A |
Send the current profile, voltage class and installation conditions — we will size the busbar and document the calculation with your quotation.
Send the current profile, voltage class and installation conditions — we will size the busbar and document the calculation.