Mon–Fri 9:00–18:00 · CST (UTC+8) · Shandong, China
Product

Copper Bar Stock

C11000 ETP copper bar stock in 12 ft lengths with no minimum order - imperial and metric sizes, cut to length, pre-tinned or silver-flashed. Request a quote.

Copper Bar Stock laminated busbar

Product imagery: factory photo plus studio renders. The exact geometry, layers and terminals of your part follow your drawing.

Specifications

Reference specification

Final values follow your drawing — this is the standard configuration of the family.

ParameterValue
AlloyC11000 Electrolytic Tough Pitch, 99.90% Cu + 0.04% O
TemperCold-drawn, half-hard
Standard length144 in (12 ft), no minimum order on full bars
Reference standardsASTM B187, B152, B283-09
Conductivity100% IACS class; low earth-fault resistance
Value-added serviceCut to length, deburred, pre-tin or silver flash
SKUSY-CM-318
Why This Family

Engineered for power conversion circuits

Key characteristics of this product family.

  • Low stray inductance for fast switching circuits
  • Full edge sealing for high-voltage creepage requirements
  • Tin-plated C11000 conductors for corrosion resistance
  • Dielectric selected by voltage class and temperature
  • Tooled, repeatable geometry — no assembly variation
  • Factory-direct with DFM review before tooling
Terminal welding detail on a SHANYUAN Copper Bar Stock laminated busbar
Product Overview

About this busbar family

Copper bar stock is semi-finished rectangular C11000 copper held in 144 in (12 ft) lengths for shops that cut, drill, punch and plate their own busbars. Our stock conductor is Electrolytic Tough Pitch copper - 99.90% Cu with 0.04% oxygen, cold-drawn to the half-hard temper - and it conforms to ASTM B187, B152 and B283-09.

Because the bar is carried in standard 12 ft lengths rather than fabricated, there is no minimum order: a single full-length bar ships for a prototype or a maintenance spares shelf, and production volumes cut from the same stock. Bars can be supplied bare, cut to your exact length with deburred ends, or delivered pre-tin-plated and pre-silver-flashed, with in-house plating (tin, matte tin, silver, nickel, lead) available on custom cuts.

C11000 ETP runs at 100% IACS class, which is why it is the default conductor for distribution and earthing: high electrical and thermal conductivity, and a very low earth-fault resistance that keeps fault currents off equipment frames.

Imperial Size Range (Inches, 144 in Long)

All imperial bars are stocked in 144 in (12 ft) lengths of cold-drawn half-hard C11000 copper. Thickness x width as listed; item codes are SHANYUAN stock references.

Thickness x WidthStock code
.094 in x 1.00 inSY-CB-101
.125 in x 1.00 inSY-CB-102
.125 in x 2.00 inSY-CB-103
.125 in x 3.00 inSY-CB-104
.125 in x 4.00 inSY-CB-105
.250 in x 1.00 inSY-CB-106
.250 in x 2.00 inSY-CB-107
.250 in x 3.00 inSY-CB-108
.250 in x 4.00 inSY-CB-109
.250 in x 5.00 inSY-CB-110
.250 in x 6.00 inSY-CB-111
.375 in x 2.00 inSY-CB-112
.375 in x 3.00 inSY-CB-113
.375 in x 4.00 inSY-CB-114
.375 in x 5.00 inSY-CB-115
.500 in x 2.00 inSY-CB-116
.500 in x 3.00 inSY-CB-117
.500 in x 4.00 inSY-CB-118

Metric Size Range (mm, 144 in Long)

Metric sizes are stocked on the same 144 in standard length and can be cut to any mm length. Thickness x width as listed; item codes are SHANYUAN stock references.

Thickness x WidthStock code
5 x 20 mmSY-CB-119
5 x 30 mmSY-CB-120
5 x 40 mmSY-CB-121
5 x 50 mmSY-CB-122
10 x 20 mmSY-CB-123
10 x 30 mmSY-CB-124
10 x 40 mmSY-CB-125
10 x 50 mmSY-CB-126
10 x 80 mmSY-CB-127
10 x 100 mmSY-CB-128
10 x 140 mmSY-CB-129

Cut-to-Length, Deburred and Plated

Need bent, punched and plated parts rather than raw bar? The same stock feeds our custom copper busbar fabrication line, so one supplier covers both semi-finished and finished needs. For earthing work, browse the grounding busbar kits, and if you are weighing copper against aluminium for a new build, our copper vs aluminium comparison covers conductivity, weight and cost. Request a cut list or a sample bar by contacting the factory.

Stock Grade Report - Why B187 C11000 Is the Shop Default

The C11000 copper busbar bar we hold in stock is one alloy out of a short list, and knowing when to step sideways saves rework. The table compares the grades fabricators usually weigh against our default ASTM B187 copper bar stock.

Stock GradeReference StandardTypical ConductivityForm We SupplyBest Use in Your Shop
C11000 ETP copperASTM B187, plus B152 and B283-09100% IACS class144 in bars, half-hard, cut to lengthEveryday distribution and earthing bars
C10100 OFHC copperASTM F68 / B170101% IACSOn request, annealedBrazed busbars where oxygen-free metal is specified
C14500 tellurium copperASTM B30190% IACSOn request, free-machiningHeavily drilled and threaded terminals
6101-T6 aluminiumASTM B31757-61% IACSWeight-saving extrusions, ask for rangeFrames and spans where weight dominates

ETP copper at 99.90% Cu with a controlled oxygen level is the sweet spot: conductive enough for distribution and fault duty, tough enough to punch and bend without cracking. The values are typical published figures for planning; confirm chemistry against the mill certificate that ships with your order. Fabricators moving between metric imperial copper bar sizes on the same job should note both series cut from the same 144 in parent length. Cold-drawn half-hard stock bends cleanly on shop brakes; if your drawing calls for tight radii, ask for the softer temper supply so cracking stays off the list of reworks. Earthing and fault-duty bars take the same half-hard stock: its low earth-fault resistance is why panel builders keep a shelf of it on site. The background on material choice is in the busbar basics guide.

Grade and standard data are typical published references; the shipped bar is certified by its mill certificate on request.

Stock Sizing Entry - Match a Rating to a Stock Bar

Stock buyers usually know the current the finished bar must carry, not the section number. The three-step pass below converts a rating into a stocked bar, in either unit system.

  1. Note the steady current the fabricated bar must carry, plus the ambient temperature it lives in.
  2. Read the first-pass section from the ampacity chart, then match it to a stocked metric or imperial bar.
  3. Send the cut list with lengths; deburred ends ship on the same lead time.
Target RatingMetric Stock SectionImperial Stock SectionTypical Shop Use
approx 200 A5 x 20 mm1 x 1/4 inEarthing bars and small feeders
approx 400 A10 x 30 mm1.5 x 3/8 inPanel feeders and retrofit repairs
approx 700 A10 x 50 mm2 x 1/4 inMachine main connections
approx 1,000 A10 x 100 mm4 x 1/4 inSwitchboard mains and ties
approx 1,400 A10 x 140 mm6 x 1/4 inParallel-bar or riser builds
approx 1,800 A12 x 150 mmask factory for widest stockHeavy tie and riser bars

Ratings are planning estimates for bars in free air; inside a sealed cabinet derate before cutting. Bars ship bare, pre-tinned or silver-flashed, and identical parent stock also feeds our finished-parts line, so prototype and production cut lists sit on one shelf. Cut bars arrive deburred to length, and prototypes ship from the same shelf as volume orders - no minimum-order penalty on the first run. Full 12 ft bars ship to the maintenance shelf, and cut lengths ship to the assembly line - both from one supplier, so your stock list does not split across vendors. For cut-to-length and plating options read the design guide or ask the factory directly for a sample bar.

Ratings are typical estimates for open-air planning; enclosure derating and the final section are confirmed with engineering on your cut list.
Typical Applications

Where you will find this family

Busbar fabricators cutting distribution bars

Where this busbar configuration earns its place.

Earthing and grounding bars

Where this busbar configuration earns its place.

Switchgear repair and retrofit workshops

Where this busbar configuration earns its place.

Panel builders making stub-up and tap bars

Where this busbar configuration earns its place.

Electrolytic cell and furnace service bars

Where this busbar configuration earns its place.

Heat-spreader and conduction plate stock

Where this busbar configuration earns its place.

Why Buy Direct from SHANYUAN

One accountable engineering partner

01

Direct engineering

Your drawings reach the engineers who build the part.

02

DFM before tooling

Design risks flagged when changes are cheap.

03

Documented QC

Test records per lot, CoC and PPAP on request.

04

End to end

Drawing to delivered production parts, one supplier.

Project Flow

How a custom project runs

From spec review to shipped, tested parts — one accountable supplier.

Spec ReviewDrawing, current rating, layers and terminals confirmed with you
DFM ReviewEdge distances, weld zones and clearances checked before tooling
QuotationTechnical and commercial quote within one business day
Sample BuildPrototypes for fit and electrical verification
Tooled ProductionControlled process with documented QC per lot
DeliveryPacked to your requirements, test records on request
FAQ

Frequently asked questions

Straight answers from the engineering team.

Can you provide documentation for our quality system?
Dimensional and electrical test records are maintained per lot. If your quality system requires CoCs, specific formats or PPAP-style documentation, tell us at quotation stage and we align the paperwork with your requirements.
What current ratings can SHANYUAN busbars handle?
Rating is designed per application up to roughly 1000 A, sized against continuous and peak current with thermal margin — see our ampacity chart for the starting reference points.
Do you support low-volume prototypes before production?
Yes. Custom projects typically run: spec review, DFM, quotation, sample build for fit and electrical verification, then tooled production with documented QC per lot.
How long does a sample build take?
A sample is typically produced within 5–7 working days from drawing approval. Fit and electrical verification is done in-house, and you receive test results together with the sample.
What quality system do you follow?
Production follows a documented process chain with batch records: incoming material checks, dimensional inspection, hipot and insulation testing, continuity checks and final visual inspection. Test records are issued per lot on request.
Do you offer warranty on your busbars?
Yes. Parts are covered against material and workmanship defects for the agreed warranty period stated in the purchase agreement. Any non-conforming parts are reworked or replaced, with failure analysis shared on request.
Related Models

From the same family

Explore

Circuits we build this family for

Every SHANYUAN busbar is custom, but the power circuits they connect recur across markets. Three typical ones — send us yours and we will point to the right stack-up.

EV Powertrains

Tight, low-inductance links between the battery source and traction inverters, fully edge-sealed for 400–800 V platforms.

Inverter DC Links

Commutation-loop connections from DC-link capacitors to IGBT bridges, designed against switching overshoot V = L × di/dt.

Solar & Wind Inverters

Converter DC links built for rising bus voltages toward 1500 VDC, with creepage and partial-discharge margins included.

Engineering Resources

Go deeper

Laminated Busbar Design Guide

Construction, dielectric selection and current capacity basics.

Read the busbar design guide

Busbar Ampacity Chart

Copper current ratings with derating guidance.

View the copper ampacity chart

Busbar vs Cable

Where laminated wins — and where it does not.

Compare busbar vs cable

Customize this busbar to your drawing

Layers, terminals, dielectrics and mounting are all configurable. Send us your spec for DFM review and a quotation within one business day.