Mon–Fri 9:00–18:00 · CST (UTC+8) · Shandong, China
Sofia Lindqvist
Sofia LindqvistHV Test & Partial Discharge Engineer

Sofia Lindqvist is a high-voltage test and partial discharge engineer with 8 years in dielectric qualification of laminated busbars. She runs IEC 60270 partial-discharge measurement, withstand-voltage and insulation diagnostics, and helped build SHANYUAN's in-house HV test lab. She holds an M.Sc. in Electric Power Engineering from KTH Royal Institute of Technology and writes about PD testing, insulation diagnostics and IEC test sequences.

Credentials · M.Sc. Electric Power Engineering, KTH · 8 years in HV testing · Built in-house PD lab

Partial DischargeIEC 60270HV Testing

Have a project for this specialist?

Share your drawing or requirement — the author's team will review it against our DFM and test records.