Mon–Fri 9:00–18:00 · CST (UTC+8) · Shandong, China
Elena Vasquez
Elena VasquezPower Electronics Application Engineer

Elena Vasquez is a power electronics application engineer with 10 years of experience integrating laminated busbars into EV inverters, charging systems and energy-storage PCS. She specializes in low-inductance DC-link design, EMC behaviour and converter packaging, and holds a B.Sc. in Electrical Engineering from Universidad Politécnica de Madrid. She writes about inverter busbar selection, stray inductance and SiC converter layouts.

Credentials · B.Sc. Electrical Engineering, UPM Madrid · 10 years in converter integration · EMC and low-inductance design

EV InverterEMCPCS Integration

Have a project for this specialist?

Share your drawing or requirement — the author's team will review it against our DFM and test records.