Mon–Fri 9:00–18:00 · CST (UTC+8) · Shandong, China

Factory Corridor & Culture Wall

Walk the main corridor of the Rizhao plant — safety signage, quality slogans and the SHANYUAN mission on the wall.

← Factory Tour Talk to an engineer Engineering resources