Lun–Ven 9:00–18:00 · Ora Cina (UTC+8) · Shandong, Cina
Custom Design Service

Built to Your Drawing

Send a drawing or specification — our engineers review it for manufacturability, quote it, and deliver tooled, tested laminated busbars. Every dimension, terminal and dielectric is configurable.

Perché il su misura conta

Ogni barra ha la sua geometria

Una barra laminata è progettata attorno al vostro contenitore, ai vostri terminali e al vostro anello di corrente. Le barre standard impongono compromessi; una barra laminata su misura è attrezzata perché strati, larghezza del conduttore, spessore dielettrico e posizioni dei terminali corrispondano esattamente al vostro disegno: un componente, zero rilavorazioni.

  • Layer stack matched to your voltage class and continuous current
  • Terminal positions tooled to your module and enclosure
  • Low-inductance layouts for IGBT, SiC and capacitor circuits
  • One DFM-reviewed part replaces dozens of cables and lugs
Custom laminated busbar engineered to the customer's drawing
Ogni dimensione è configurabile

Otto aree che progettiamo secondo il vostro disegno

Conductor Layers

1 to 6+ conductors in one insulated stack, tuned to your current path.

Conductor Material

C11000 copper as standard; aluminum available on request.

Dielectric Films

PET, Nomex or epoxy (DLF) selected by voltage class and temperature.

Surface Plating

Tin as standard for corrosion resistance and solderability.

Terminals

M6/M8 studs, blade tabs, screw and welded terminals, fused links.

Geometry & Tolerances

Length, width, thickness, cut-outs and terminal windows to your drawing.

Mounting Hardware

Integrated brackets, standoffs, edge seals and bolt-down ears.

Testing & Documentation

Hipot, insulation, continuity, dimensional records, CoC and PPAP.

Specifiche di barre su misura

La gamma che progettiamo

ParameterRange / Option
Conductor layers1 – 6+ (custom stack-ups)
Conductor materialC11000 copper (standard), aluminum on request
PlatingTin (standard); alternative finishes by request
DielectricsPET, Nomex, epoxy (DLF) — selected by voltage class
Voltage class48 V to 1,200 V+ per your insulation coordination
Rated currentUp to ~1000 A per design (see ampacity chart)
Terminal typesM6/M8 threaded studs, blade tabs, screw, welded, fused links
Temperature rise30 °C reference; derated for ambient and enclosure
MountingIntegrated brackets, standoffs, edge seals
DocumentationCoC, test records, PPAP-style on request

Reference values are design starting points. Final specifications are defined in the quotation and released drawing for your project. See the busbar ampacity chart for current ratings and derating factors.

How Custom Projects Run

Six steps, one accountable supplier

Send RequirementDrawing (PDF/DXF), current rating, layers, terminals, quantity
DFM ReviewEngineers flag edge distances, weld zones, dielectric clearances
QuotationTechnical and commercial quote within one business day
Sample BuildPrototypes for fit and electrical verification
ProductionTooled, controlled process with documented QC per lot
DeliveryPacked to your requirements, test records on request
Costruite la vostra barra su misura

Un modulo di specifica guidato

Compilate ciò che sapete: il resto lo lasciamo ai nostri ingegneri. La vostra selezione viene compilata in una richiesta strutturata e apre WhatsApp o e-mail precompilati. Nessun account, nessun download.

01 Product Family
02 Electrical Specification
03 Materials
04 Geometry & Dimensions (mm)
05 Terminals & Mounting
06 Environment & Application
07 Volume & Delivery
08 Quality & Documentation

Required testing (select all that apply)

Documentation (select all that apply)

09 Contact Details
Email Instead

Your specification is delivered straight to our engineering team and recorded in our inquiry system. Prefer WhatsApp? Use the secondary button — it opens a pre-filled chat. For drawings, email busbar@shanyo.com with your PDF/DXF reference.

Supporto di progettazione incluso

Oltre il preventivo

A

Stack-up advice

Layer count recommendations for your voltage class and current.

B

Dielectric guidance

Thermal class vs. dielectric strength, matched to your environment.

C

Terminal review

Placement checked against your enclosure and mating parts.

D

Inductance layout

Inductance-oriented layout advice for switching circuits.

Progettazione per la producibilità

Individuato presto, corretto a basso costo

Prima di tagliare qualsiasi attrezzaggio, i nostri ingegneri eseguono una revisione DFM del vostro disegno: strati, percorsi di corrente, spaziatura terminali, distanze di bordo e giochi dielettrici. Individuare una distanza di bordo critica o una zona di saldatura sottodimensionata in questa fase costa molto meno che scoprirla in produzione.

01

Layer count

Stack-up validated against voltage class and current.

02

Current paths

Cross-sections checked against continuous and peak current.

03

Terminal spacing

Pitch and weld zones matched to mating hardware.

04

Edge distances

Creepage and dielectric clearances verified before tooling.

Beyond the Bar: Integrated Subassemblies as One Delivered Part

The direction in high-current programs is that OEMs increasingly buy the laminated busbar not as a loose part but as part of a delivered subsystem — busbar plus connectors, flexible jumpers and cooling hardware integrated into one assembly. Reference market examples of this move are battery disconnect units (BDUs) for electrified powertrains and packaged power-conversion assemblies, where the supplier count shrinks and the line build becomes a drop-in installation rather than a harness build. For a custom laminated busbar design shop, this is the natural upward extension: the bar is already the backbone of the cabinet, so carrying terminals, jumpers and brackets along with it changes little at the drawing stage and a great deal on the customer’s floor.

The co-design principle behind it is that the busbar and its connector land are engineered together, not retrofitted. Industry datasheets specify the bar cross-section at every contact — for example a 38.1 × 4.8 mm copper land with an M6 thread at one frame size, and a 25.4 × 3.2 mm blade at another — and poles are paralleled in a single housing when a single contact cannot carry the current. Specifying the bar around the contact geometry is what makes blind-mate, hot-pluggable and service-friendly interfaces possible at all.

Four transferable design principles recur across this family of work:

  • Multi-finger parallel contact beams — many small contact junctions in parallel instead of one high-force joint: lower insertion force, lower contact resistance, lower temperature rise and long cycle life.
  • Open-side clip construction — taps anywhere along the bar, hot-pluggable under load, so modules can be swapped without rewiring.
  • Laminated, stacked conductors — low inductance, minimal voltage drop and controlled partial discharge in a compact envelope.
  • Modular rail concept — full power available at any tap position, n+1 redundant feeds, lengths built up from modular sections.

When the joint itself moves — vibration, thermal expansion between module and bar — a flexible laminated jumper between rigid ends carries the motion without fatiguing the bolted joint, as explained in flexible laminated busbars. Whether you start from a drawing or from a current-path sketch, our DFM review turns the same principles against your layout; the process is outlined in the laminated busbar design guide, and reference stacked builds are shown under multi-layer insulated busbars.

Applicazioni su misura

Dove le barre su disegno giustificano l'attrezzaggio

Piattaforme EV e ibride

Interconnessioni di modulo, tappi BMS e collegamenti pack per architetture 400–800 V.

Storage energetico

Interconnessioni DC di rack e string per ESS utility, C&I e residenziale.

Inverter e UPS

DC-link a bassa induttanza e connessioni di fase IGBT per conversione di potenza.

Azionamenti industriali

Laminati di fase e DC-link per azionamenti a frequenza variabile e servo.

Alimentatori

Interconnessioni banchi condensatori e barre raddrizzatore per conversione AC-DC.

Alimentazione data center

Distribuzione ad alta corrente per rack, barre e backup.

13+Anni dal 2012
1–6+Strati conduttori
~1000 APortata nominale
1 giornoRisposta tecnica
FAQ

Domande frequenti

Risposte dirette dal team di ingegneria.

Di quali informazioni avete bisogno per un preventivo su una barra collettrice laminata?
Un disegno (PDF o DXF) o una foto di un campione esistente, la portata e la classe di tensione richieste, il numero di strati conduttori, i tipi di terminale, il quantitativo annuo stimato e l'applicazione. A fronte di una specifica completa, il nostro team tecnico risponde entro un giorno lavorativo.
Quanti strati conduttori potete realizzare?
Realizziamo stack-up custom da 1 a 6+ strati. Il numero di strati, la disposizione dei terminali e la configurazione di montaggio sono definiti dal vostro disegno e verificati in DFM prima dell'attrezzatura.
Potete fornire documentazione per il nostro sistema qualità?
I registri delle prove dimensionali ed elettriche sono conservati per ogni lotto. Se il vostro sistema qualità richiede CoC, formati specifici o documentazione in stile PPAP, comunicatelo in fase di preventivo e allineeremo la documentazione alle vostre esigenze.
Dove vengono prodotti i vostri componenti?
Tutte le barre sono progettate, attrezzate e prodotte nel nostro stabilimento nello Shandong, in Cina: un unico partner tecnico responsabile dal disegno al componente consegnato.
Qual è il lead time tipico per gli ordini di produzione?
I campioni vengono spediti entro 5–7 giorni lavorativi. Le produzioni con attrezzatura richiedono di norma 2–3 settimane dopo l'approvazione del campione, in funzione della quantità e della complessità dello stack-up. Confermiamo una data certa con ogni preventivo.
Quale sistema qualità seguite?
La produzione segue una catena di processo documentata con registri di lotto: controlli materiale in ingresso, controllo dimensionale, prove hipot e di isolamento, verifiche di continuità e controllo visivo finale. I registri di prova vengono emessi per lotto su richiesta.
Le barre possono essere fornite con terminali, prigionieri o connettori pre-assemblati?
Sì. Prigionieri, terminali a lama, elementi a fusibile e kit connettore possono essere saldati o assemblati in fabbrica, così ricevete componenti drop-in adatti al vostro processo di assemblaggio.
Supportate imballaggio e spedizione internazionale?
Sì. I componenti sono imballati con protezione bordi, film antistatico e cartoni da export secondo le vostre esigenze di movimentazione, e spediti via mare o via aerea. Con ogni spedizione forniamo i documenti commerciali (fattura, lista di imballaggio, registri di prova).

Start your custom project today

Drawing or not — send the requirement and we will advise on the configuration.