Inviateci un disegno o una specifica — il nostro team di ingegneri risponde entro un giorno lavorativo.
Taoyuan Village, Wulian Street, Rizhao, Shandong, China
Monday–Friday, 9:00–18:00 (China Standard Time, UTC+8)
Non condividiamo i vostri dati con terze parti.
PDF or DXF — or a photo of an existing sample.
Required current rating and voltage class.
Number of conductor layers and terminal types.
Estimated annual quantity, application and target market.
Attach a drawing in PDF or DXF format — or a clear photo of an existing sample — together with the required current rating, voltage class, number of conductor layers, terminal types and estimated annual quantity. The more of these your inquiry states, the faster our engineers can turn it into a technical quote rather than a back-and-forth request for missing details. If a parameter is still undecided, send what you know and we will recommend the configuration. See how we structure a custom busbar project.
Your inquiry is reviewed by our engineering team, not a sales desk. First comes a DFM review: edge distances, weld zones and dielectric clearances are checked against your drawing. A technical quotation follows within one business day for a complete spec. Approved samples are typically built in 5–7 working days for fit and electrical verification, and tooled production runs ship in about 2–3 weeks after sample approval. Test records travel with every lot. Start the flow on the custom busbar design page.
Parts ship factory direct from our plant in Rizhao, Shandong — by sea or air, to suit your production planning. We already supply OEM customers in more than 20 countries, and we pack with edge protection, anti-static film and export-grade cartons to your handling requirements. Commercial documents — invoice, packing list and the requested test records — are prepared with every shipment. Our quality & testing process is what those records document.
Monday–Friday, 9:00–18:00. Inquiries are reviewed on business days; DFM feedback and quotations typically follow within one business day of a complete spec.
Time zones: we respond to Asia, Europe and the Americas across the working day — WhatsApp works best for fast replies.
La qualità è costruita nell'impilamento, nella finestra di laminazione e nella saldatura dei terminali, poi verificata e registrata.
Costruzione, scelta dielettrica e basi di capacità.
Leggi la guida di progettazioneRisposte dirette dal team di ingegneria.
Con disegno o senza — inviateci il requisito e i nostri ingegneri vi consiglieranno sulla configurazione.
Your data: Your inquiry is stored securely in our system and reviewed by our engineering team. We do not share your details with third parties. See our Privacy Policy for details.