Lun–Vie 9:00–18:00 · Hora de China (UTC+8) · Shandong, China
Custom Design Service

Built to Your Drawing

Send a drawing or specification — our engineers review it for manufacturability, quote it, and deliver tooled, tested laminated busbars. Every dimension, terminal and dielectric is configurable.

Por qué importa el a medida

Cada barra tiene su propia geometría

Una barra laminada se diseña alrededor de su gabinete, sus terminales y su bucle de corriente. Las barras estándar fuerzan compromisos; una barra laminada a medida se utilla para que capas, ancho de conductor, espesor dieléctrico y posiciones de terminales coincidan exactamente con su plano: una pieza, cero retrabajo.

  • Layer stack matched to your voltage class and continuous current
  • Terminal positions tooled to your module and enclosure
  • Low-inductance layouts for IGBT, SiC and capacitor circuits
  • One DFM-reviewed part replaces dozens of cables and lugs
Custom laminated busbar engineered to the customer's drawing
Cada dimensión es configurable

Ocho áreas que diseñamos según su plano

Conductor Layers

1 to 6+ conductors in one insulated stack, tuned to your current path.

Conductor Material

C11000 copper as standard; aluminum available on request.

Dielectric Films

PET, Nomex or epoxy (DLF) selected by voltage class and temperature.

Surface Plating

Tin as standard for corrosion resistance and solderability.

Terminals

M6/M8 studs, blade tabs, screw and welded terminals, fused links.

Geometry & Tolerances

Length, width, thickness, cut-outs and terminal windows to your drawing.

Mounting Hardware

Integrated brackets, standoffs, edge seals and bolt-down ears.

Testing & Documentation

Hipot, insulation, continuity, dimensional records, CoC and PPAP.

Especificaciones de barras a medida

El rango que diseñamos

ParameterRange / Option
Conductor layers1 – 6+ (custom stack-ups)
Conductor materialC11000 copper (standard), aluminum on request
PlatingTin (standard); alternative finishes by request
DielectricsPET, Nomex, epoxy (DLF) — selected by voltage class
Voltage class48 V to 1,200 V+ per your insulation coordination
Rated currentUp to ~1000 A per design (see ampacity chart)
Terminal typesM6/M8 threaded studs, blade tabs, screw, welded, fused links
Temperature rise30 °C reference; derated for ambient and enclosure
MountingIntegrated brackets, standoffs, edge seals
DocumentationCoC, test records, PPAP-style on request

Reference values are design starting points. Final specifications are defined in the quotation and released drawing for your project. See the busbar ampacity chart for current ratings and derating factors.

How Custom Projects Run

Six steps, one accountable supplier

Send RequirementDrawing (PDF/DXF), current rating, layers, terminals, quantity
DFM ReviewEngineers flag edge distances, weld zones, dielectric clearances
QuotationTechnical and commercial quote within one business day
Sample BuildPrototypes for fit and electrical verification
ProductionTooled, controlled process with documented QC per lot
DeliveryPacked to your requirements, test records on request
Construya su barra a medida

Un formulario de especificación guiado

Complete lo que sepa: el resto lo dejamos a nuestros ingenieros. Su selección se compila en una consulta estructurada y abre WhatsApp o correo precargados. Sin cuenta ni descarga.

01 Product Family
02 Electrical Specification
03 Materials
04 Geometry & Dimensions (mm)
05 Terminals & Mounting
06 Environment & Application
07 Volume & Delivery
08 Quality & Documentation

Required testing (select all that apply)

Documentation (select all that apply)

09 Contact Details
Email Instead

Your specification is delivered straight to our engineering team and recorded in our inquiry system. Prefer WhatsApp? Use the secondary button — it opens a pre-filled chat. For drawings, email busbar@shanyo.com with your PDF/DXF reference.

Soporte de diseño incluido

Más allá de la cotización

A

Stack-up advice

Layer count recommendations for your voltage class and current.

B

Dielectric guidance

Thermal class vs. dielectric strength, matched to your environment.

C

Terminal review

Placement checked against your enclosure and mating parts.

D

Inductance layout

Inductance-oriented layout advice for switching circuits.

Diseño para fabricabilidad

Detectado a tiempo, corregido barato

Antes de cortar cualquier utillaje, nuestros ingenieros hacen una revisión DFM de su plano: capas, rutas de corriente, separación de terminales, distancias de borde y holguras dieléctricas. Detectar una distancia de borde ajustada o una zona de soldadura pequeña en esta etapa es mucho más barato que descubrirlo en producción.

01

Layer count

Stack-up validated against voltage class and current.

02

Current paths

Cross-sections checked against continuous and peak current.

03

Terminal spacing

Pitch and weld zones matched to mating hardware.

04

Edge distances

Creepage and dielectric clearances verified before tooling.

Beyond the Bar: Integrated Subassemblies as One Delivered Part

The direction in high-current programs is that OEMs increasingly buy the laminated busbar not as a loose part but as part of a delivered subsystem — busbar plus connectors, flexible jumpers and cooling hardware integrated into one assembly. Reference market examples of this move are battery disconnect units (BDUs) for electrified powertrains and packaged power-conversion assemblies, where the supplier count shrinks and the line build becomes a drop-in installation rather than a harness build. For a custom laminated busbar design shop, this is the natural upward extension: the bar is already the backbone of the cabinet, so carrying terminals, jumpers and brackets along with it changes little at the drawing stage and a great deal on the customer’s floor.

The co-design principle behind it is that the busbar and its connector land are engineered together, not retrofitted. Industry datasheets specify the bar cross-section at every contact — for example a 38.1 × 4.8 mm copper land with an M6 thread at one frame size, and a 25.4 × 3.2 mm blade at another — and poles are paralleled in a single housing when a single contact cannot carry the current. Specifying the bar around the contact geometry is what makes blind-mate, hot-pluggable and service-friendly interfaces possible at all.

Four transferable design principles recur across this family of work:

  • Multi-finger parallel contact beams — many small contact junctions in parallel instead of one high-force joint: lower insertion force, lower contact resistance, lower temperature rise and long cycle life.
  • Open-side clip construction — taps anywhere along the bar, hot-pluggable under load, so modules can be swapped without rewiring.
  • Laminated, stacked conductors — low inductance, minimal voltage drop and controlled partial discharge in a compact envelope.
  • Modular rail concept — full power available at any tap position, n+1 redundant feeds, lengths built up from modular sections.

When the joint itself moves — vibration, thermal expansion between module and bar — a flexible laminated jumper between rigid ends carries the motion without fatiguing the bolted joint, as explained in flexible laminated busbars. Whether you start from a drawing or from a current-path sketch, our DFM review turns the same principles against your layout; the process is outlined in the laminated busbar design guide, and reference stacked builds are shown under multi-layer insulated busbars.

Aplicaciones de barras a medida

Dónde las barras sobre plano justifican su utillaje

Plataformas EV e híbridas

Interconexiones de módulo, tomas BMS y enlaces de pack para arquitecturas de 400–800 V.

Almacenamiento de energía

Interconexiones DC de rack y string para ESS de red, C&I y residencial.

Inversores y UPS

DC-links de baja inductancia y conexiones de fase IGBT para conversión de potencia.

Accionamientos industriales

Laminados de fase y DC-link para variadores de frecuencia y servos.

Fuentes de alimentación

Interconexiones de bancos de condensadores y barras de rectificador para conversión AC-DC.

Alimentación de centros de datos

Distribución de alta corriente para racks, barras y respaldo.

13+Años desde 2012
1–6+Capas conductoras
~1000 ACorriente nominal
1 dayRespuesta técnica
FAQ

Preguntas frecuentes

Respuestas directas del equipo de ingeniería.

¿Qué datos necesitan para cotizar una barra colectora laminada?
Un plano (PDF o DXF) o una foto de una muestra existente, la corriente nominal y la clase de tensión requeridas, el número de capas conductoras, los tipos de terminal, la cantidad anual estimada y la aplicación. Con una especificación completa, nuestro equipo de ingeniería suele responder en un día laborable.
¿Cuántas capas conductoras pueden fabricar?
Fabricamos apilados a medida de 1 a 6+ capas. El número de capas, la disposición de los terminales y la configuración de montaje se definen en su plano y se revisan en la fase DFM antes del utillaje.
¿Pueden aportar documentación para nuestro sistema de calidad?
Los registros de ensayo dimensionales y eléctricos se conservan por lote. Si su sistema de calidad exige CoC, formatos específicos o documentación tipo PPAP, indíquelo en la fase de cotización y ajustamos la documentación a sus requisitos.
¿Dónde se fabrican sus productos?
Todas las barras se diseñan, utillan y producen en nuestras propias instalaciones en la provincia de Shandong, China: un único socio de ingeniería responsable, del plano a la pieza entregada.
¿Cuál es el plazo habitual de entrega para pedidos de producción?
Las muestras se envían en 5–7 días laborables. Las series con utillaje suelen tardar 2–3 semanas tras la aprobación de la muestra, según la cantidad y la complejidad del apilado. Confirmamos una fecha firme en cada cotización.
¿Qué sistema de calidad aplican?
La producción sigue una cadena de procesos documentada con registros de lote: inspección de materia prima entrante, control dimensional, ensayos hipot y de aislamiento, verificaciones de continuidad e inspección visual final. Los registros de ensayo se emiten por lote, previa petición.
¿Pueden suministrar las barras con terminales, espigas o conectores premontados?
Sí. Espigas, terminales de pala, enlaces fusibles y juegos de conectores pueden soldarse o ensamblarse en fábrica, de modo que usted recibe piezas listas para montar, adaptadas a su proceso de ensamblaje.
¿Dan servicio de embalaje y envío internacional?
Sí. Las piezas se embalan con protección de bordes, película antiestática y cajas de exportación según sus requisitos de manipulación, y se envían por mar o por aire. Los documentos comerciales (factura, lista de embalaje, registros de ensayo) se acompañan en cada envío.

Start your custom project today

Drawing or not — send the requirement and we will advise on the configuration.