Lun–Ven 9:00–18:00 · Ora Cina (UTC+8) · Shandong, Cina
Case Study · Industrial Automation / Variable Frequency Drives

VFD Three-Phase Busbar: 400 A Modules Cut Cabinet Wiring by 60%

Andino Drives, a Brazilian manufacturer of industrial variable-frequency drives, engaged SHANYUAN in 2026 to replace the cable-based power interconnects in its 400 A VFD cabinet line. The laminated three-phase busbar cut cabinet wiring by 60%, saved two hours of assembly time per unit, and passed the IP20 clearance and creepage tests for the open-frame design.

ByThomas O'Brien Industrial Automation / Variable Frequency Drives Customer Case Study
Customer & Project

Project at a Glance

Andino Drives S.A. Industrial Automation / Variable Frequency Drives Brazil · Latin America distribution Industrial VFD power-module laminated busbar Delivered 2026

This case study is published as a representative engineering project. The product photograph and released drawing are illustrative of the delivered part; exact dimensions are covered by the customer's non-disclosure agreement.

Engineering Disegnos

Released Disegno

Engineering drawing for Andino Drives — Industrial VFD power-module laminated busbar
Released drawing excerpt
Engineering drawing for Andino Drives — Industrial VFD power-module laminated busbar
Released drawing excerpt

Customer drawings are treated as confidential; excerpts shown here are provided with permission and illustrate the layer stack, terminal layout and dielectric boundaries of the delivered part.

Product Photograph

The Delivered Part

Laminated busbar delivered for Andino Drives — Industrial VFD power-module laminated busbar
Representative product photograph of the delivered laminated busbar — insulated stack, terminals and dielectric finish as released for production.
Specifications

Project Parameters

Customer & platformAndino Drives 400 A industrial VFD, 480 V three-phase
Busbar typeThree-phase laminated busbar, C11000 copper, 2.0 mm conductors
Dielectric systemPET film wrap, 2.5 kV hi-pot, IP20 clearance
Corrente nominale400 A continuous, 500 A 60 s
Elevazione di temperaturaΔT 26 °C at rated current, 45 °C ambient
Wiring reduction60% less cabinet wiring, 2 h assembly saving per unit
TerminalsBolted taps for module and line/load connections, tin-plated
ProductionMonthly batches, 100% hi-pot per part
Quantified result60% less wiring, 26 °C ΔT, 400 A, 2 h saved per unit

Andino Drives, a Brazilian manufacturer of industrial variable-frequency drives, engaged SHANYUAN in 2026 to replace the cable-based power interconnects in its 400 A VFD cabinet line. The laminated three-phase busbar cut cabinet wiring by 60%, saved two hours of assembly time per unit, and passed the IP20 clearance and creepage tests for the open-frame design.

The challenge: cable bundles were the bottleneck in a 400 A cabinet

Andino's 400 A VFD cabinet used individual cable runs between the input terminals, DC-link, IGBT modules and output terminals. Field service data showed that most wiring errors happened during this cable dressing, and the cabinet builder needed roughly 4 hours per unit for routing, lacing and testing the power interconnects.

The customer asked SHANYUAN for a three-phase laminated busbar that would carry the 400 A power path in one part, accept the standard module and terminal connections, and pass IP20 clearance for the open-frame cabinet. The busbar vs cable guide documents exactly this trade-off: impedance, thermal behaviour and assembly cost.

The application matches the industrial application page; our manufacturing process article describes how the one-piece part is produced.

The solution: one laminated three-phase part replaces the cable bundle

The delivered busbar carries all three phases in a single laminated stack, with insulated inter-phase spacing and bolted taps at the module positions and at line/load ends. Phase-to-phase insulation uses PET film with a 2.5 kV hi-pot rating, giving IP20-class clearance in the open frame.

Module taps use M8 studs with torque stripe; the design reuses the busbar components pattern for the mounting hardware. The complete part installs in 25 minutes versus roughly 3 hours of cable dressing — the 60% wiring reduction the customer recorded on the first production batch.

The layer stack and conductor sizing follow the design guide and the ampacity chart; for the 400 A rating with 60 °C operating temperature the 2.0 mm conductors carry comfortable margin.

Thermal and manufacturing engineering

Temperature-rise testing at 400 A in a 45 °C ambient chamber measured 26 °C rise with the hot spot at the output tap — inside the 30 °C budget. The thermal management guide documents the cabinet convection assumptions for open-frame VFDs.

Manufacturing uses the standard lamination line: stamping, stacking, vacuum lamination, terminal assembly and hi-pot test. The welding and bending steps follow the welding and joining guide; terminal machining follows the terminal machining guide.

Because the VFD market is cost-sensitive, the design uses standard C11000 copper and PET film — no exotic materials — while keeping joint resistance below 30 μΩ per tap, verified with a four-wire meter.

Qualification and production ramp

Qualification covered a 2.5 kV hi-pot, thermal cycling −25 °C to +70 °C, and a 1000-hour loaded endurance run on the prototype cabinet. All passed; the customer's test laboratory verified the thermal-rise and wiring-reduction claims independently.

Series production runs in monthly batches aligned with Andino's cabinet build plan. Every part receives a 100% hi-pot test at the quality laboratory, and each batch ships with a joint-resistance scan record. The factory tour shows the production stations.

The customer's assembly line now installs the busbar in 25 minutes with a single torque-audit step, and rework from wiring errors dropped to near zero on the first three production months.

Quantified results

The delivered busbar met every target: 400 A continuous with 26 °C rise, 60% less cabinet wiring, two hours of assembly time saved per unit, and IP20-clearance pass in the open-frame cabinet.

Across Andino's 4000-unit annual build, the assembly saving is roughly 8000 labour-hours per year, and the single-part BOM simplified their inventory: one busbar SKU replaced ten cable SKUs. The automated production article and the DFM checklist explain why the one-piece approach scaled so cleanly.

For VFD and industrial drive engineers, the industrial application page, the power electronics busbar range and the engineering contact form are the entry points we recommend.

Wiring cut60% less cabinet wiring
Assembly2 h saved per unit
Current400 A continuous
ΔT at rating26 °C @ 45 °C ambient
FAQ

Frequently asked questions

How does a laminated busbar reduce VFD cabinet wiring?
One laminated three-phase part replaces the individual cable runs between input, DC-link, modules and output. It installs in 25 minutes versus roughly 3 hours of cable dressing, and eliminates most wiring-error rework.
Is the busbar cost-effective for a cost-sensitive VFD market?
Yes — it uses standard C11000 copper and PET film, and replaces ten cable SKUs with one busbar SKU. Across a 4000-unit annual build the assembly saving is roughly 8000 labour-hours per year.
What clearance does the open-frame cabinet need?
Phase-to-phase insulation is PET film with a 2.5 kV hi-pot rating, providing IP20-class clearance in the open frame with comfortable margin.
Correlati

Continua a leggere

Barre Laminate SHANYUAN: Distribuzione di Potenza per Linee di Produzione Automatizzate
Prodotti e applicazioni

Barre Laminate SHANYUAN: Distribuzione di Potenza per Linee di Produzione Automatizzate

Le linee di produzione automatizzate necessitano di una distribuzione di potenza

Leggi l’articolo
Checklist DFM per Barre Laminate 2026: cosa verificare prima di inviare il disegno
Progettazione

Checklist DFM per Barre Laminate 2026: cosa verificare prima di inviare il disegno

Ogni ora spesa in DFM prima di un'offerta per barra custom risparmia una settima

Leggi l’articolo
Thomas O'Brien
Thomas O'BrienIngegnere di processo produttivo

Thomas O'Brien è ingegnere di processo produttivo con 14 anni di esperienza in stampaggio, laminazione e lavorazione dei terminali per sbarre laminate. Gestisce linee di produzione per profili di precisione, strati isolanti e lavorazione CNC, concentrandosi sul controllo dimensionale e sulla ri

StampaggioLaminazioneLavorazione CNC
Vedi bio completa

Stai progettando una barra per questa applicazione?

Inviate profilo di corrente, classe di tensione e tipi di terminali — i nostri ingegneri rispondono entro un giorno lavorativo.