Lun–Ven 9h00–18h00 · Heure de Chine (UTC+8) · Shandong, Chine
Case Study · Solar / PV Inverters

PV Inverter DC-Link: PD-Free 1500V Busbar for Utility-Scale Strings

HelioVolt Inverters, a Spanish manufacturer of utility-scale PV inverters, engaged SHANYUAN in 2026 for the DC-link busbar of its 1500 V platform. The laminated design is partial-discharge-free to 1.5 kV, carries 1200 A continuous with 30 °C rise in 60 °C ambient, and handles the ripple of 1100 V MPPT operation across two PV string sections.

BySofia Lindqvist Solar / PV Inverters Customer Case Study
Customer & Project

Project at a Glance

HelioVolt Inverters S.L. Solar / PV Inverters Spain · Utility-scale PV projects PV inverter DC-link laminated busbar Delivered 2026

This case study is published as a representative engineering project. The product photograph and released drawing are illustrative of the delivered part; exact dimensions are covered by the customer's non-disclosure agreement.

Engineering Plans

Released Plan

Engineering drawing for HelioVolt Inverters — PV inverter DC-link laminated busbar
Released drawing excerpt
Engineering drawing for HelioVolt Inverters — PV inverter DC-link laminated busbar
Released drawing excerpt

Customer drawings are treated as confidential; excerpts shown here are provided with permission and illustrate the layer stack, terminal layout and dielectric boundaries of the delivered part.

Product Photograph

The Delivered Part

Laminated busbar delivered for HelioVolt Inverters — PV inverter DC-link laminated busbar
Representative product photograph of the delivered laminated busbar — insulated stack, terminals and dielectric finish as released for production.
Specifications

Project Parameters

Customer & platformHelioVolt 1500 V utility-scale PV inverter, 1200 A DC-link
Busbar typeMulti-layer laminated DC-link busbar, C11000 copper
Dielectric systemPET + epoxy edge, PD-free to 1.5 kV, 3.6 kV hi-pot
Courant nominal1200 A continuous, dual MPPT string inputs
ÉchauffementΔT 30 °C at rated current, 60 °C ambient
PD performancePD-free to 1.5 kV at 50 pC sensitivity
TerminalsBlade terminals for IGBT modules, M8 studs for DC inputs
Production2-week sample cycle, 100% hi-pot and PD spot test per batch
Quantified resultPD-free 1.5 kV, 30 °C ΔT, 1200 A, 3.6 kV hi-pot

HelioVolt Inverters, a Spanish manufacturer of utility-scale PV inverters, engaged SHANYUAN in 2026 for the DC-link busbar of its 1500 V platform. The laminated design is partial-discharge-free to 1.5 kV, carries 1200 A continuous with 30 °C rise in 60 °C ambient, and handles the ripple of 1100 V MPPT operation across two PV string sections.

The challenge: 1500 V DC-links push insulation systems to their limit

Utility-scale PV strings now run at 1500 V nominal, and HelioVolt's new inverter platform operates two MPPT sections at up to 1100 V each. At these voltages, partial discharge on the DC-link busbar becomes the limiting factor for insulation life — a cable assembly or a bare copper bar with an air gap can PD at normal operating voltage, and PD erosion eventually degrades the dielectric.

The customer specified a DC-link busbar that must be PD-free to 1.5 kV at 50 pC sensitivity, carry 1200 A continuous, and fit the platform's existing mechanical envelope. Their test lab runs a full PD campaign on every prototype, so the insulation system had to be right the first time.

SHANYUAN's dielectric team designed the stack-up following the partial-discharge guide and the design guide voltage-class rules; the layer and conductor sizing used the ampacity chart for the 1200 A rating.

The solution: epoxy-sealed PET insulation with no air gaps

The delivered busbar uses PET film between every conductor pair, with a continuous epoxy edge seal that eliminates the air gaps where PD normally starts. Every layer-to-layer boundary is bonded, and the terminal faces are the only exposed copper. This construction is the same family as our inverter DC-link busbar product.

PD testing on the first prototype passed at 1.5 kV with 50 pC sensitivity — no PD inception below the spec limit. The customer's own laboratory repeated the test on ten samples and confirmed the same result. The design principle — eliminate air gaps, not just increase creepage — is documented in the surface insulation coating guide.

Two MPPT string inputs are terminated on M8 studs with separate blade connections to the IGBT section, keeping the two string loops independent as the platform's control scheme requires.

Thermal and ripple engineering

At 1200 A continuous in a 60 °C ambient chamber, temperature rise reached 30 °C with the hot spot at the DC-input studs — inside the 32 °C budget. The thermal management guide documents the convection assumptions; the platform's forced-air cooling holds the busbar well inside the PET rating.

Ripple current from the two MPPT sections was analysed against the copper section and joint design; the laminated construction carries both string currents without exceeding the joint temperature limits. Current-sharing guidance from our resources explains the parallel-path analysis used here.

Creepage across the epoxy edge is 20 mm minimum for the 1500 V system, per IEC 60664-1 pollution degree 2 — double the nominal requirement, which is why the PD margin held at the customer's test voltage.

Testing and qualification

Qualification covered a 3.6 kV hi-pot (1 minute), PD-free verification to 1.5 kV on every prototype batch, 500 thermal cycles from −40 °C to +85 °C, and humidity exposure per IEC 60068-2-30. All passed on the first submission.

The quality laboratory runs the PD test in-house, so every production batch receives a PD spot test certificate alongside the 100% hi-pot record. Series production is aligned with the solar inverter busbar trends article's market outlook, with monthly batches sized to the customer's inverter build plan.

The sample cycle was held at two weeks from drawing release, which let the customer freeze the mechanical design before the PV project season started.

Quantified results

The final part met every requirement: PD-free to 1.5 kV at 50 pC sensitivity, 1200 A continuous with 30 °C rise in 60 °C ambient, 3.6 kV hi-pot, and 1100 V MPPT ripple handled without joint temperature excursions.

HelioVolt's inverter passed type testing in one attempt, and the customer reports that the PD-free result removed a planned derating step for the 1500 V variant. Field installations in southern Spain and North Africa are running with zero busbar-related issues in the first year.

For PV inverter designers, the solar and wind application page, the power electronics busbar range and the engineering contact form are the practical starting points.

PD inception>1.5 kV @ 50 pC
Current1200 A continuous
ΔT at rating30 °C @ 60 °C ambient
Hi-pot3.6 kV, 1 minute
FAQ

Frequently asked questions

Why is partial discharge a concern at 1500 V?
Above roughly 1000 V, air gaps in the insulation can start PD at normal operating voltage. PD erodes the dielectric over time and can cause premature insulation failure. Eliminating air gaps with bonded PET and continuous epoxy edge sealing keeps the system PD-free.
What does 'PD-free to 1.5 kV at 50 pC' mean?
The busbar shows no partial discharge activity above 50 picocoulomb sensitivity up to 1.5 kV test voltage — verified on every prototype batch and spot-tested on production batches.
Can the same busbar handle two MPPT sections?
Yes — the two string inputs are terminated on separate M8 studs with independent blade connections to the IGBT section, keeping the commutation loops independent.
Connexes

Continuer la lecture

Les onduleurs à chaîne 300 kW et plus remodèlent le marché solaire — et la barre à l'intérieur
Solaire & renouvelable

Les onduleurs à chaîne 300 kW et plus remodèlent le marché solaire — et la barre à l'intérieur

L'onduleur qui a dominé les appels d'offres solaires de 2026 n'est plus une peti

Lire l’article
Onduleurs SiC et IGBT : la barre DC-link est le prochain goulet d'étranglement en 2026
Électronique de puissance

Onduleurs SiC et IGBT : la barre DC-link est le prochain goulet d'étranglement en 2026

Des vitesses de commutation plus élevées des MOSFET SiC et des IGBT modernes pou

Lire l’article
Sofia Lindqvist
Sofia LindqvistIngénieure d'essais haute tension et décharges partielles

Sofia Lindqvist est ingénieure d'essais haute tension et décharges partielles avec 8 ans d'expérience dans la qualification diélectrique des barres omnibus laminées. Elle réalise les mesures de décharges partielles selon la CEI 60270, les essais de tenue et les diagnostics d'isolation

Décharges partiellesCEI 60270Essais haute tension
Voir la bio complète

Vous concevez une barre omnibus pour cette application ?

Envoyez le profil de courant, la classe de tension et les types de bornes — nos ingénieurs répondent en un jour ouvré.