Laminated Busbars

SHANYUAN manufactures insulated laminated busbars in two engineered families — battery busbars and power electronics busbars — plus fully custom designs built to your drawing.

What Is a Laminated Busbar?

A laminated busbar is a multi-layer conductor assembly: flat copper conductors separated by thin dielectric films, bonded under heat and pressure into a single insulated part. Terminals are pre-mounted and the whole assembly arrives ready to install. Compared with hand-routed cable harnesses, laminated busbars deliver lower stray inductance, higher power density and faster, error-proof assembly.

Battery module busbar product family

Battery Busbars

Multi-terminal insulated laminates for EV battery modules, ESS racks and BMS interconnections.

Browse battery busbars
Power electronics busbar product family

Power Electronics Busbars

Blade- and tab-terminal laminates for IGBT modules, inverters, DC links and capacitor banks.

Browse power busbars
Custom welded laminated busbar assembly

Custom Design Service

Any layer count, terminal layout and mounting configuration — from drawing to delivered parts.

Start a custom project

All Busbar Products