Inverter Busbars

In the commutation loop of an inverter, every nanohenry counts. Laminated busbars cut loop inductance to keep switching devices inside their safe operating area.

Where Busbars Are Used in Power Conversion

  • DC link — the laminated connection between the capacitor bank and the inverter bridge
  • IGBT and IPM phase legs — matched busbar sets with blade terminals at module pin pitch
  • Capacitor banks — multi-tab laminates sharing current evenly across parallel capacitors
  • EV traction inverters — compact, fully insulated assemblies for high-voltage platforms

Why Inductance Matters Here

When an IGBT or SiC MOSFET switches, the stray inductance of the DC loop appears directly as overshoot voltage across the device: V = L × di/dt. Faster devices make this worse, not better. A laminated busbar places the forward and return conductors face-to-face inside one dielectric stack, which cancels most of the loop area — and with it, most of the overshoot.

  • Layer count and conductor width tuned with your DC link capacitor placement
  • Standoff and creepage reviewed for your voltage class
  • Terminal pitch matched to module datasheets to avoid adaptation hardware