Blade Terminal Busbar Assembly
Compact laminated busbar assembly with blade terminals for low-profile power distribution.
Description
Compact laminated busbar assembly with blade terminals for low-profile power distribution.
A compact blade-terminal laminate for low-profile power distribution inside enclosures where vertical space is limited. The blade terminals mate directly with connector housings or module pins, removing the need for separate lug hardware.
Specifications
| Parameter | Value |
|---|---|
| Conductor | C11000 copper, tin plated |
| Conductor layers | 1–2 (typical) |
| Dielectric | PET / Nomex / epoxy (DLF), selected by voltage class |
| Terminals | Blade terminals (one side) |
| Current rating | Per design, up to ~1000 A |
| Edge treatment | Full edge sealing |
| SKU | SY-PE-206 |
Typical Applications
- Low-profile power distribution
- Connector-mated assemblies
- Compact power supplies
Design Notes
Blade dimensions follow your connector or module specification. Fully insulated edges for assembly near other live parts.
All specifications are typical and fully customizable to your drawing. Request a quote for this busbar or send your own specification — our engineers respond within one business day.






