Multi-Layer Insulated Busbar
Multi-layer insulated laminated busbar with mixed terminal types for complex distribution layouts.
Description
Multi-layer insulated laminated busbar with mixed terminal types for complex distribution layouts.
When one laminate has to carry both power and low-current sense paths, this multi-layer insulated busbar stacks conductors with different cross-sections in a single bonded assembly. Mixed terminal types — studs, holes and tabs — keep the whole distribution layout in one part.
Specifications
| Parameter | Value |
|---|---|
| Conductor | C11000 copper, tin plated |
| Conductor layers | 3+ (custom stack-up) |
| Dielectric | PET / Nomex / epoxy (DLF), selected by voltage class |
| Terminals | Mixed: threaded studs, plain holes, tabs |
| Current rating | Per design, up to ~1000 A |
| Edge treatment | Full edge sealing |
| SKU | SY-BB-108 |
Typical Applications
- Combined power + sense distribution
- Complex module wiring
- Space-constrained pack layouts
Design Notes
Layer stack-up, dielectric selection and terminal mix are defined per drawing. Our engineers review the stack for creepage distances.
All specifications are typical and fully customizable to your drawing. Request a quote for this busbar or send your own specification — our engineers respond within one business day.






