Busbar Ampacity Chart

Copper busbar current ratings by cross-section, plus the derating factors that decide whether those numbers survive in your enclosure.

Copper Busbar Ampacity — DC and 50/60 Hz AC

Values below are the standard industry reference for copper bars (C11000) at a 30 °C rise above a 40 °C ambient, mounted flat in free air:

Cross-section (mm)Area (mm²)DC current (A)AC 60 Hz (A)
10 × 330~150~150
15 × 345~200~200
20 × 360~250~250
25 × 375~300~295
30 × 5150~450~440
40 × 5200~550~535
50 × 5250~650~630
60 × 6360~800~770
80 × 6480~1000 A~960
100 × 6600~1150~1100

Derating: Where the Real Number Comes From

The table above is a starting point. In a real assembly, apply these factors:

FactorEffectTypical derate
Ambient temperatureHigher ambient raises conductor temperature−1% per °C above 40 °C
Bundled barsAdjacent conductors heat each other−10 to −20% depending on spacing
Enclosed / still airReduced convection−10 to −25%
AltitudeThinner air cools less effectively−1% per 200 m above 1000 m
AC frequencySkin and proximity effect push current to surfacesMaterial above ~1 kHz; consult us
Pulsed currentThermal mass absorbs short pulsesCan allow higher peaks than continuous

Laminated Stacks vs. Single Bars

A laminated busbar is not a single thick bar — it is several thinner conductors in parallel. Total cross-section sets the resistive heating, but current sharing between layers depends on terminal placement and connection symmetry. Uneven sharing overloads one layer while another runs cool. This is why terminal layout is reviewed during our DFM stage rather than left to chance.

How We Use This Chart

  • Start with your continuous current and voltage class
  • Apply the derating factors for your actual mounting and ambient
  • Select conductor cross-section and layer count with margin
  • Confirm the thermal class of the dielectric against the resulting temperature

Send us your current profile and installation conditions — we will size the busbar and document the calculation with your quotation.