Multi-Terminal Battery Module Busbar

Insulated laminated busbar with eight double-threaded terminals for high-current distribution across EV battery modules.

Description

Insulated laminated busbar with eight double-threaded terminals for high-current distribution across EV battery modules.

A multi-terminal battery module busbar distributes high current across the parallel cell groups of an EV battery module. This laminate carries eight double-terminal positions on a single insulated plate, replacing the bundle of cables or flat straps typically used for module-level interconnection.

Specifications

ParameterValue
ConductorC11000 copper, tin plated
Conductor layers2 (typical)
DielectricPET / Nomex / epoxy (DLF), selected by voltage class
Terminals8 × double M6 threaded studs (position per drawing)
Current ratingPer design, up to ~1000 A
Edge treatmentFull edge sealing
SKUSY-BB-101

Typical Applications

  • EV battery modules (BEV / PHEV)
  • ESS module interconnection
  • High-current distribution boards

Design Notes

Terminal count, position and stud size are set by your drawing. Fused link positions can be integrated into the same laminate.

All specifications are typical and fully customizable to your drawing. Request a quote for this busbar or send your own specification — our engineers respond within one business day.

WhatsApp