Dual-Layer Cell Interconnect Busbar
Two-layer insulated laminate with screw terminals for cell-to-cell interconnection in compact battery packs.
Description
Two-layer insulated laminate with screw terminals for cell-to-cell interconnection in compact battery packs.
This dual-layer cell interconnect busbar links adjacent cells or cell groups inside a compact battery pack. The narrow profile keeps the laminate inside tight cell spacing, while the screw terminals give bolted joints that survive vibration and thermal cycling.
Specifications
| Parameter | Value |
|---|---|
| Conductor | C11000 copper, tin plated |
| Conductor layers | 2 |
| Dielectric | PET / Nomex / epoxy (DLF), selected by voltage class |
| Terminals | 2 × screw terminals + 1 × threaded stud |
| Current rating | Per design, up to ~1000 A |
| Edge treatment | Full edge sealing |
| SKU | SY-BB-102 |
Typical Applications
- Cell-to-cell interconnection
- Compact EV battery packs
- Module-level parallel links
Design Notes
Conductor width, terminal spacing and hole pattern are fully custom. Nickel-plated or laser-weldable tabs can replace screw terminals.
All specifications are typical and fully customizable to your drawing. Request a quote for this busbar or send your own specification — our engineers respond within one business day.






