Compact Cell Fusion Busbar
Compact laminated cell fusion busbar with threaded stud for battery management and fused connections.
Description
Compact laminated cell fusion busbar with threaded stud for battery management and fused connections.
This compact laminate combines the power path and a fused link in one thin assembly for cell-level protection. The threaded stud provides the measurement or service tap, while the fused section isolates the cell group on a fault — a layout common in BMS-protected packs.
Specifications
| Parameter | Value |
|---|---|
| Conductor | C11000 copper, tin plated |
| Conductor layers | 1–2 (typical) |
| Dielectric | PET / Nomex / epoxy (DLF), selected by voltage class |
| Terminals | 2 × screw tabs + 1 × threaded stud |
| Current rating | Per design, up to ~1000 A |
| Edge treatment | Full edge sealing |
| SKU | SY-BB-107 |
Typical Applications
- Cell-level fused links
- BMS-protected battery packs
- Service tap points
Design Notes
Fuse element geometry and rating are designed with your protection requirements. Ask about integrated fuse sections.
All specifications are typical and fully customizable to your drawing. Request a quote for this busbar or send your own specification — our engineers respond within one business day.






