Mon–Fri 9:00–18:00 · CST (UTC+8) · Shandong, China
Contact

Talk to Us Directly

Send a drawing or specification — our engineering team replies within one business day.

📞

Call / WhatsApp

+86 136 4542 9121

Call us ↗

💬

WhatsApp (fastest)

+1 519 253 9195

Chat on WhatsApp ↗

✉️

Email

busbar@shanyo.com

Write to us ↗

📍

Location

Taoyuan Village, Wulian Street, Rizhao, Shandong, China

🕘

Working hours

Monday–Friday, 9:00–18:00 (China Standard Time, UTC+8)

13+Years since 2012
1–6+Conductor layers
~1000 ACurrent rating
1 dayTechnical response
Send an Inquiry

Your inquiry is reviewed by our engineering team

We do not share your details with third parties.

This form opens WhatsApp with your message pre-filled. Prefer email? Write to busbar@shanyo.com with the same details.

What to Include in Your Inquiry

The faster we see the requirement, the faster we can quote

01

Drawing

PDF or DXF — or a photo of an existing sample.

02

Electrical spec

Required current rating and voltage class.

03

Construction

Number of conductor layers and terminal types.

04

Context

Estimated annual quantity, application and target market.

Working Hours

When to reach engineering

China Standard Time (UTC+8)

Monday–Friday, 9:00–18:00. Inquiries are reviewed on business days; DFM feedback and quotations typically follow within one business day of a complete spec.

Time zones: we respond to Asia, Europe and the Americas across the working day — WhatsApp works best for fast replies.

Quality Commitments

Documented, batch by batch

Quality is built into the layup, the lamination window and the terminal welding — then verified and recorded.

DFM review before toolingIn-house QC per production lotBatch test records on requestCoC / PPAP-style documentation
Engineering Resources

Go deeper

Laminated Busbar Design Guide

Construction, dielectric selection and current capacity basics.

Read

Busbar Ampacity Chart

Copper current ratings with derating guidance.

View

Busbar vs Cable

Where laminated wins — and where it does not.

Compare
FAQ

Frequently asked questions

Straight answers from the engineering team.

What information do you need to quote a laminated busbar?
A drawing (PDF or DXF) or a photo of an existing sample, the required current rating and voltage class, number of conductor layers, terminal types, estimated annual quantity, and the application. With a complete specification, our engineering team typically responds within one business day.
What testing is performed on production lots?
Testing follows the specification agreed at design freeze: dielectric withstand (hipot), insulation resistance, dimensional inspection, visual inspection of plating and edge sealing, and continuity checks per conductor path.
Where are your products made?
All busbars are engineered, tooled and produced in our own facility in Shandong Province, China — a focused manufacturer, not a trading company.
What is the minimum order quantity (MOQ)?
There is no MOQ for samples and pre-production prototypes. For tooled production we work with your demand — from low-volume pilot runs to series orders — so quantity is agreed per project rather than forced by a fixed minimum.
How long does a sample build take?
A sample is typically produced within 5–7 working days from drawing approval. Fit and electrical verification is done in-house, and you receive test results together with the sample.
Can busbars be supplied with terminals, studs or connectors pre-assembled?
Yes. Studs, blade tabs, fused links and connector sets can be welded or assembled at the factory, so you receive drop-in parts matched to your assembly process.

We reply within one business day.

Drawing or not — send the requirement and our engineers will advise on the configuration.

Your data

Your inquiry is stored securely in our system and reviewed by our engineering team. We do not share your details with third parties. See our Privacy Policy for details.