Battery Management System Busbar

BMS busbar combining power and voltage-sense layers with copper terminal studs.

Description

BMS busbar combining power and voltage-sense layers with copper terminal studs.

A BMS busbar combines the high-current path and the voltage-sense layer in one laminated assembly. The paired stud terminals give consistent, low-resistance measurement points across the module, which matters for accurate cell balancing and state-of-charge estimation.

Specifications

ParameterValue
ConductorC11000 copper, tin plated
Conductor layers2–3 (power + sense)
DielectricPET / Nomex / epoxy (DLF), selected by voltage class
TerminalsPaired copper threaded studs
Current ratingPer design, up to ~1000 A
Edge treatmentFull edge sealing
SKUSY-BB-110

Typical Applications

  • BMS voltage sensing
  • Cell balancing circuits
  • EV and ESS modules

Design Notes

Sense conductor cross-section and stud material are selected for measurement accuracy. Layer separation prevents sense-path interference.

All specifications are typical and fully customizable to your drawing. Request a quote for this busbar or send your own specification — our engineers respond within one business day.

WhatsApp