Copper Battery Link Busbar Pair
Matched pair of copper link busbars with mounting tabs for series and parallel battery connections.
Description
Matched pair of copper link busbars with mounting tabs for series and parallel battery connections.
A matched pair of copper link busbars for symmetric pack layouts — one for each side of a module or string. Both parts are cut from the same tooling, so terminal positions and mounting tabs line up across the assembly without shimming or rework.
Specifications
| Parameter | Value |
|---|---|
| Conductor | C11000 copper, tin plated |
| Conductor layers | 1–2 (typical) |
| Dielectric | PET / Nomex / epoxy (DLF), selected by voltage class |
| Terminals | 2 × screw terminals per link + mounting tabs |
| Current rating | Per design, up to ~1000 A |
| Edge treatment | Full edge sealing |
| SKU | SY-BB-104 |
Typical Applications
- Series / parallel battery links
- Symmetric module layouts
- Serviceable pack joints
Design Notes
Supplied as a matched pair with identical tooling. Mounting tab geometry follows your enclosure design.
All specifications are typical and fully customizable to your drawing. Request a quote for this busbar or send your own specification — our engineers respond within one business day.






