High-Current Battery Module Busbar
High-current laminated busbar for EV battery modules with distributed stud terminals and sealed edges.
Description
High-current laminated busbar for EV battery modules with distributed stud terminals and sealed edges.
For modules that push several hundred amps, this high-current busbar spreads current across distributed stud terminals instead of concentrating it on one joint. The multi-terminal layout lowers local current density and keeps terminal temperatures down across the module.
Specifications
| Parameter | Value |
|---|---|
| Conductor | C11000 copper, tin plated |
| Conductor layers | 2–3 (typical) |
| Dielectric | PET / Nomex / epoxy (DLF), selected by voltage class |
| Terminals | Multiple double M8 threaded studs |
| Current rating | Per design, up to ~1000 A |
| Edge treatment | Full edge sealing |
| SKU | SY-BB-103 |
Typical Applications
- High-current EV battery modules
- Fast-charge battery architectures
- ESS string interconnection
Design Notes
Conductor cross-section is sized against your peak and continuous current. Ask our engineers for a stack-up recommendation.
All specifications are typical and fully customizable to your drawing. Request a quote for this busbar or send your own specification — our engineers respond within one business day.






