Welded Busbar Assembly
Welded laminated busbar assembly for high-current power distribution with pre-mounted tabs.
Description
Welded laminated busbar assembly for high-current power distribution with pre-mounted tabs.
A welded busbar assembly where the terminal tabs are resistance-welded to the laminate instead of bolted. The welded joints carry high vibration loads and high current without loosening — suited to traction and heavy-duty power distribution.
Specifications
| Parameter | Value |
|---|---|
| Conductor | C11000 copper, tin plated |
| Conductor layers | 1–3 (typical) |
| Dielectric | PET / Nomex / epoxy (DLF), selected by voltage class |
| Terminals | Welded tabs (multiple positions) |
| Current rating | Per design, up to ~1000 A |
| Edge treatment | Full edge sealing |
| SKU | SY-PE-214 |
Typical Applications
- Traction power distribution
- High-vibration environments
- High-current assemblies
Design Notes
Weld joint geometry and tab material are validated against your current profile and vibration specification.
All specifications are typical and fully customizable to your drawing. Request a quote for this busbar or send your own specification — our engineers respond within one business day.






