EV Inverter Laminated Busbar

Laminated busbar for EV traction inverters with blade terminals for high-voltage architectures.

Description

Laminated busbar for EV traction inverters with blade terminals for high-voltage architectures.

A traction inverter busbar for 400–800 V EV architectures. The full edge sealing and dielectric selection are specified for the voltage class, and the blade terminals mate with the power module pins and DC link connections inside the inverter housing.

Specifications

ParameterValue
ConductorC11000 copper, tin plated
Conductor layers2–4 (typical)
DielectricPET / Nomex / epoxy (DLF), selected by voltage class
TerminalsBlade terminals
Current ratingPer design, up to ~1000 A
Edge treatmentFull edge sealing
SKUSY-PE-213

Typical Applications

  • EV traction inverters
  • Onboard chargers
  • High-voltage distribution units

Design Notes

Dielectric class and creepage distances are set by your platform voltage. Tell us the voltage class at quotation.

All specifications are typical and fully customizable to your drawing. Request a quote for this busbar or send your own specification — our engineers respond within one business day.

WhatsApp