Blade Terminal Busbar Assembly

Compact laminated busbar assembly with blade terminals for low-profile power distribution.

Description

Compact laminated busbar assembly with blade terminals for low-profile power distribution.

A compact blade-terminal laminate for low-profile power distribution inside enclosures where vertical space is limited. The blade terminals mate directly with connector housings or module pins, removing the need for separate lug hardware.

Specifications

ParameterValue
ConductorC11000 copper, tin plated
Conductor layers1–2 (typical)
DielectricPET / Nomex / epoxy (DLF), selected by voltage class
TerminalsBlade terminals (one side)
Current ratingPer design, up to ~1000 A
Edge treatmentFull edge sealing
SKUSY-PE-206

Typical Applications

  • Low-profile power distribution
  • Connector-mated assemblies
  • Compact power supplies

Design Notes

Blade dimensions follow your connector or module specification. Fully insulated edges for assembly near other live parts.

All specifications are typical and fully customizable to your drawing. Request a quote for this busbar or send your own specification — our engineers respond within one business day.

WhatsApp