Power Electronics Laminated Busbar
Laminated busbar for power converters with side tab terminals and central mounting stud.
Description
Laminated busbar for power converters with side tab terminals and central mounting stud.
This power electronics busbar carries the phase output of a converter or inverter stage. Side tab terminals mate to the output buswork while the central stud provides the mechanical anchor — a common layout for industrial drives and power supplies.
Specifications
| Parameter | Value |
|---|---|
| Conductor | C11000 copper, tin plated |
| Conductor layers | 2 (typical) |
| Dielectric | PET / Nomex / epoxy (DLF), selected by voltage class |
| Terminals | Side blade tabs + central threaded stud |
| Current rating | Per design, up to ~1000 A |
| Edge treatment | Full edge sealing |
| SKU | SY-PE-205 |
Typical Applications
- Converter phase outputs
- Industrial drives
- Power supply output stages
Design Notes
Tab width, thickness and pitch are matched to your mating conductors. Dielectric class selected by your voltage requirement.
All specifications are typical and fully customizable to your drawing. Request a quote for this busbar or send your own specification — our engineers respond within one business day.






