Capacitor Bank Busbar
Multi-tab laminated busbar for capacitor bank connections in power converters.
Description
Multi-tab laminated busbar for capacitor bank connections in power converters.
A multi-tab laminate for connecting a bank of parallel DC link capacitors. Each tab feeds one capacitor position, so the current splits evenly across the bank instead of loading the capacitors closest to the main terminals hardest.
Specifications
| Parameter | Value |
|---|---|
| Conductor | C11000 copper, tin plated |
| Conductor layers | 2 (typical) |
| Dielectric | PET / Nomex / epoxy (DLF), selected by voltage class |
| Terminals | Multiple blade / screw tabs |
| Current rating | Per design, up to ~1000 A |
| Edge treatment | Full edge sealing |
| SKU | SY-PE-212 |
Typical Applications
- DC link capacitor banks
- Power converter input stages
- Snubber networks
Design Notes
Tab count and pitch follow your capacitor layout. Even current sharing is verified in our DFM review.
All specifications are typical and fully customizable to your drawing. Request a quote for this busbar or send your own specification — our engineers respond within one business day.






