Applications

Laminated busbars are specified where power density, inductance and assembly reliability decide the design — electric vehicles, energy storage and power conversion.

Electric Vehicles

Module interconnections, BMS sense taps and pack-level joints for 400–800 V architectures.

EV busbar solutions

Energy Storage

Rack- and string-level DC interconnections for utility-scale and C&I battery storage.

ESS busbar solutions

Inverters & UPS

Low-inductance DC links and IGBT module interconnects for power conversion.

Inverter busbar solutions