Custom Laminated Busbars

Send a drawing or specification — our engineers review it for manufacturability, quote it, and deliver tooled, tested laminated busbars.

How Custom Projects Run

  1. Send your requirement — drawing (PDF/DXF), current rating, layer count, terminal types, quantity
  2. DFM review — our engineers flag design risks: edge distances, weld zones, dielectric clearances
  3. Quotation — technical and commercial quote, typically within one business day of a complete spec
  4. Sample build — prototypes for fit and electrical verification
  5. Production — tooled, controlled process with documented QC per lot
  6. Delivery — packed to your requirements with test records on request

What We Can Build

CapabilityRange
Conductor layers1–6+ (custom stack-ups)
Conductor materialC11000 copper (standard), aluminum on request
PlatingTin (standard)
DielectricsPET, Nomex, epoxy (DLF)
Terminal typesM6/M8 threaded studs, blade tabs, screw terminals, welded tabs, fused links
Current ratingPer design, up to ~1000 A
MountingIntegrated brackets, standoffs, edge seals

Design Support Included

  • Layer stack-up recommendations for your voltage class and current
  • Dielectric selection guidance (thermal class vs. dielectric strength)
  • Terminal placement review against your enclosure and mating parts
  • Inductance-oriented layout advice for switching circuits