Contact

Send a drawing or specification — our engineering team replies within one business day.

Talk to Us Directly

  • WhatsApp (fastest): +1 519 253 9195
  • Location: Shandong Province, China
  • Working hours: Monday–Friday, 9:00–18:00 (China Standard Time, UTC+8)

What to Include in Your Inquiry

The faster we can see the requirement, the faster we can quote. Helpful items:

  • Drawing (PDF or DXF), or a photo of an existing sample
  • Required current rating and voltage class
  • Number of conductor layers and terminal types
  • Estimated annual quantity
  • Application and target market

Send an Inquiry

    Your inquiry is stored securely in our system and reviewed by our engineering team. We do not share your details with third parties.